:orphan: FS Work Package: Template ========================= .. fswp:: Template :id: FSWP_template :tags: fswp :date: 2025-05-21 :status: PASS .. list-table:: * - Date - 2025-06-09 * - Project - :need:`PRJ_M100` * - Redmine main issue - https://redmine.sspn.app/issues/240 * - Responsible - JR, WF Background ***************** Affected components ******************** Hardware designs ---------------- Mechanical designs ------------------ Manuals/Documentation --------------------- Approvals --------- Products -------- Impact analysis (non safety) **************************** Impact analysis (functional safety) *********************************** Affected requirements ********************* Guideline ********* * For every approved/decided change, this document shall be filled in. * To minimize the number of document types, this document is also used for new products, as the Functional Safety aspects are very similar. * Affected components are the different parts in the technical file that needs to be updated. This includes both Functional Safety parts and non-safety parts. * Project should be the one project where the work is logged. * Redmine main issue is the top level issue in redmine that covers the change. It should be within the project. * Impact Analysis is divided into two parts. The Safety parts need to link to testable verification and follow up in this document. * Affected requirements are the sphinx requirements that are modified/added/removed.